You have reached one of our paid Practical Application video tutorials for the course:

ARE 5.0 Project Planning & Design Exam Prep

You can either log in to view it or learn more about our memberships.

- Incorporating Elevators into the Drawings

2m 21s

In this ARE 5.0 NCARB-approved Project Planning and Design Exam Prep course you will learn about the topics covered in the ARE 5.0 PPD exam division. A complete and comprehensive curriculum, this course will touch on each of the NCARB objectives for the ARE 5.0 Project Planning and Design Exam.

Instructor Mike Newman will discuss issues related to the generation or evaluation of design alternatives that synthesize environmental, cultural, behavioral, technical and economic issues.

When you are done with this course, you will have a thorough understanding of the content covered in the ARE 5.0 Project Planning and Design Exam including design concepts, sustainability/environmental design, universal design, and other forms of governing codes and regulations. 

Transcript summarylog in to access this content in full.

So what you're seeing here is the main lobby, building service office, main electric room, trash room, mail room, a service vestibule, and then two elevators. And the two elevators up here are, one is a passenger, and then this one here is a passenger/service elevator. So it actually has two doors, front and back, which the back door opens up off the service vestibule, and then the front door opens up to the main tenant lobby.

Log in to access files

From the course:
ARE 5.0 Project Planning & Design Exam Prep

Duration: 31h

Author: Mike Newman