In this ARE 5.0 NCARB-approved Project Planning and Design Exam Prep course you will learn about the topics covered in the ARE 5.0 PPD exam division. A complete and comprehensive curriculum, this course will touch on each of the NCARB objectives for the ARE 5.0 Project Planning and Design Exam.

Instructor Mike Newman will discuss issues related to the generation or evaluation of design alternatives that synthesize environmental, cultural, behavioral, technical and economic issues.

When you are done with this course, you will have a thorough understanding of the content covered in the ARE 5.0 Project Planning and Design Exam including design concepts, sustainability/environmental design, universal design, and other forms of governing codes and regulations. 

Transcript summarylog in to access this content in full.

And currently the existing water treatment plant is located in the heart of downtown approximately right here where it says Grand Forks and in 1997 there was 100 year flood that inundated almost the entire city but the infrastructure, mostly the water treatment plant, really felt it because the flood waters came rushing in and filled all the basins with sludge and mud and all kinds of things you wouldn't want in a clean water supply. So when this project came up, and it was time to fix those issues that were going on, the city got serious about where they wanted to put that new water treatment plant project and what that means from a flooding standpoint and they actually decided to move the project five miles, approximately five miles west of the existing plant and what is currently outside of city limits but is being rezoned to be within it inside of an old farmers field. That gets it outside of the flood plain regardless of having the flood wall there.